Project image
Salem End Road Bridge at Stearns Reservoir

Concrete repairs were made to reinforce the transverse girder under the bridge. DOT Concrete Mix and FLOW Control were used.

READ MORE


Project image
Fast-Setting DOT Concrete Mix Ensures N.C. Bridge Opens on Time

NCDOT performed a full rehab on the bascule bridge. The contractor removed and replaced the concrete surrounding the hinges and anchored the bearing plates that support the drawbridge. Using DOT Concrete Mix allowed the contractor to complete the work at night and have all bridge lanes opened to traffic on weekends and between 6 a.m. and 7 p.m. Mondays through Thursdays.

READ MORE


Project image
Walmart Distribution Center Steel Troughs

Pulling out and disposing of the existing steel troughs previously used as a washout room would be costly. But leaving them in would have compromised the cleanliness of the space. DOT Concrete Mix with integral corrosion inhibitor was used to fill in the troughs.

READ MORE


Project image
Quick Repairs Keep the Commodore Barry Bridge Open

70,000 square feet of partial depth bridge deck repairs were performed with DOT Concrete Mix. Up to two lanes were closed at night and then reopened in the morning.

READ MORE