Vinton Construction Beats the Clock on Runway Repairs

Appleton International Airport's two runways intersect instead of running parallel to each other, so pavement repairs require closing both at the same time -- not ideal for keeping traffic moving. As a result, fines for not reopening a nighttime repair are hefty. An award-winning Wisconsin contractor used Rapid Set® DOT Repair Mix to make sure overnight partial-depth surface and joint repairs were for traffic by 6 am.

READ MORE


Project image
Fast Emergency Repairs Made to Bridge

New cross beams were placed within 24-hours to minimize traffic disruption. Concrete Mix, FLOW Control and SET Control were used to make the 10 concrete pedestals used to support the cross beams.

READ MORE


Project image
Concrete Mix is the Material of Choice for Military Project

Concrete pads were installed over an existing slab as part of a commercial boiler installation project at Fort Sam Houston. Products used included Concrete Mix, FLOW Control, and SET Control.

READ MORE


Project image
Tallahassee Capitol Building Underground Parking Garage

Potentially catastrophic structural damage was discovered in the Senate office building parking garage. Excessive loading from landscaping above ground caused water to infiltrate the garage, causing concrete spalling as well as stress on a main girder. Mortar Mix Plus, SET Control and WunderFixx were used for both interior and exterior garage repairs.

READ MORE


Project image
Sullivan County Jail

The structure’s 9'x7' cells had to be pitched at 25 degrees, from 1.25-inch down to ¼-inch. Aggressive diamond grinding was used to make the surface porous. After grading, Sure-Flex epoxy was used. Mortar Mix Plus, SET Control and FLOW Control were used.

READ MORE


Project image
Salem End Road Bridge at Stearns Reservoir

Concrete repairs were made to reinforce the transverse girder under the bridge. DOT Concrete Mix and FLOW Control were used.

READ MORE


Project image
Manhole Restoration with No Delays

After removing the concrete around the manholes, the collars were reset to the correct elevations using Concrete Mix. SET Control was used when temperatures rose. With no delays, crews met the construction schedule.

READ MORE


Project image
Wyong Train Station on Old Pacific Highway

Copings at train station were repaired to provide a safe surface for embarking/disembarking passengers. Work was performed during hot weather with temperatures reaching 95 degrees Fahrenheit. Cement All and SET Control were used.

READ MORE


Project image
New Flooring Installed at Weiss High School

Extensive new flooring was installed in the interior. To accommodate the flooring, Cement All was used to raise the concrete pads. SET Control was used to increase the working time, allowing more time for placement and finishing.

READ MORE


Project image
Tesla Store in Bellevue

During the store remodel, workers had to perform extensive surface prep prior to the TRU installation. Cement All was used for the repairs and TRU Self-Leveling with integral colors were used as the polished concrete overay. The final surface was polished to an 800 grit and sealed.

READ MORE


Project image
Tarpon Springs Water Treatment Plant

Acrylic Primer, Cement All, Concrete Resurfacer, LevelFlor, SET Control and WunderFixx were used in various areas of the completed facility to mitigate standing water and create sanitary, level surfaces.

READ MORE


Project image
Jack C Hays High School

The shower drains were too flat and not draining properly. Cement All was applied after chipping around the drain to create a slope. It was chosen because of its high bond properties and ability to be applied at a thin application.

READ MORE


Project image
Repairing Hurricane Damage At Marriott San Juan And Stellaris Casino

To renovate the 19,000 square-foot space with minimal interruptions to operations, the deck was divided into sections so that a portion of the pool area remained open to guests at all times. CR Concrete Resurfacer, Mortar Mix and Concrete Mix were used to make repairs. Thanks to the fast-curing Rapid Set products, delays due to rainfall were able to be made up and the project completed on time and within budget.

READ MORE


Project image
County of San Diego Central Courthouse Bus Ramp

Mortar Mix Plus (MMP) was used to level an elevated-deck bus exit ramp. Since this was a fast-track project and MMP achieves 3,500 psi in 3 hours, the contractor was able to meet the deadline.

READ MORE


Project image
Colorado Tower: Office Skyscraper

The Colorado Tower opened as Austin, Texas’ first high rise in 10 years. In the construction of the 2 outdoor patios Rapid Set Cement All and Mortar Mix was used to meet the specifications that called for high-bond and early strength upon the waterproofing membrane.

READ MORE


Project image
Camp Pendleton, Marine Corps Air Station

The runway lights on the airfield needed to be replaced, and spec requirements required a product that would be close to 5,000 psi in a 24-48 hours. After Concrete Mix with Flow Control and Set Control showed 7,900 psi in 24 hours, the material was used in the replacement of 26 lights. By using two bags at a time, the project schedule dropped from two months down to three weeks.

READ MORE


Project image
Blue Ribbon Sushi Bar & Grill At The Grove

Cement All was used to patch the substrate before performing surface prep. To prevent pinholes and create a strong adhesive grip for the topping, TXP Fast Epoxy Primer was used. TRU Self-Leveling with integral coloring was used as the topping. To make sure the TRU did not set too fast in the heat, SET Control was added to the mix.

READ MORE


Project image
Aeropuerto Internacional De Tocumen

Concrete Mix was used to level the seven concrete pads inside this airport's electrical and mechanical rooms. SET Control was used to extend the working time due to the hot temperature setting time and FLOW Control was used to enhance the flow consistency.

READ MORE


Project image
University of Massachusetts Amazon Distribution Center

Tri-State Underlayments/Franz Floors only had four days to restore 1,200 sq ft of the existing flooring before interior framing began. For this reason, the contractor chose to use Rapid Set cement products to install the flooring, because they set quickly to produce 3,000 psi in one hour and full strength of 8,000 psi in one day. Products used include Concrete Mix, FLOW Control, SET Control, TXP Primer, TRU Self-Leveling.

READ MORE


Project image
Interstate 10 Earthquake Repairs

The January 17, 1994, Northridge 6.6 earthquake did immense damage to many of the region’s vital traffic arteries. One serious disruption was the closing of the I-10 Santa Monica freeway due to the collapse of two bridges. The 1-10 is the busiest freeway in the nation. C.C. Myers completely rebuilt the two bridges 74 days ahead of schedule and received a $14.5 million bonus. Products used include Rapic Set Cement, Rapid Set Flowable Fill, and SET Control.

READ MORE


Project image
Historic Texaco Headquarters Makeover

The historic restoration project includes converting the 1915 concrete-and-brick office building into 300 apartments, 10,000 square feet of retail space, and a 500-space parking garage. Products used include Mortar Mix, V/O Repair Mix, and WunderFixx.

READ MORE


Project image
International Concrete: Fast-Setting Cement Solves Problems Around the World

Five international projects show how construction products play a supporting role in industries where new technology rollouts, tight timelines, and sustainable design are the new normal. Products used include Cement All, Concrete Mix, Rapid Set Cement, SET Control, and TRU Self-Leveling.

READ MORE